Deep Water Wells

  • Offset well review
  • Casing seat selection
  • Casing design
  • Planning – directional, mud, cement, bit, BHA etc.,
  • Analysis – torque, drag, ECD and hydraulics models
  • Risk evaluation with mitigation
  • Time and cost estimates
  • DP operations and Mooring system
  • Subsea wellhead and BOP equipment
  • Risers
  • Emergency disconnect operations
  • Production testing and completion
  • Abandonment
  • Statement of requirements for rig, services and tangibles for drilling the well with specifications
  • Well control

In addition to the Detailed Complete Well Design, Selective Options are provided as below:

New Work

  • Concept Selection
  • Feasibility Check
  • Preliminary Design

Review of Client Completed Work

  • Review of Well Design
  • Optimization of Well Design